Introduction
A big (extensive) bridge is a fixed dental prosthesis (FDP) that replaces several teeth and/or spans several segments of the arch, with three or more abutments. It often includes a pier abutment or crosses the curve of the arch. Full-arch stabilization means joining all the remaining teeth of an arch into one rigid unit so that the occlusal load is shared by every root.
Definition, types and when a big bridge is chosen
Terms in use: extensive or long-span FDP; bridge with an intermediate (pier) abutment; cross-arch FDP; complete-arch (circular) FDP; and the splint-bridge (a splint with pontics) in periodontally reduced dentitions.
- The gaps are described with Kennedy's classification and Applegate's rules. Big fixed bridges are typically Class III with modifications, or Class IV crossing the midline.
- Occlusal support is described with Eichner's groups: A has all four posterior support zones, B has some lost, C has none.
- A big fixed bridge needs bounded spaces. Free-end saddles (Class I and II) are not bridged, except by short cantilevers.
- The shortened dental arch concept (Käyser): missing molars do not automatically have to be replaced, which can spare the patient an unnecessary long span.
Indications: several bounded gaps with enough healthy or treatable abutments; secondary splinting of mobile teeth after completed periodontal therapy; replacement of missing teeth together with stabilization of the rest.
Contraindications:
- abutment support insufficient for the span; hopeless abutments
- uncontrolled periodontitis and poor oral hygiene
- untreated parafunction (relative)
- a patient who cannot accept the long treatment or its cost
- young patients with large pulps (relative, because so many teeth are prepared)